How to clean the Concrete Mixer in Concrete Batching Plant?

Q: How to clean the twin shaft Concrete Mixer in concrete batching plant?

A: Hello, sir. First of all, thank you for choosing our JS twin shaft concrete mixer in your batching plant.

The cleaning work of the concrete mixer is as follows:

(a)When the production is over or the machine is down for more than half an hour, the mixer should be cleaned. The remaining material in the mixer should be thoroughly cleaned after batching the material every day . Meanwhile , in the process of water washing, the gravel can be mixed with about 500kg for the sake of the cleaner cleaning.

Concrete-Mixer

(b)The discharging door of mixer will remain open after opening. In the meantime, the discharging door can be manually switched to fully wash the blender gate as required. 

(c)If the shutdown time exceeds more than one week, the material in each measuring bucket must be emptied(such as cement, water, admixture and various kinds of aggregate), Cleaning the discharging hopper, so as to avoid material hardened.

If you have any question, Please contact with us.

>>Previous: How to Set Up a temporary Concrete Batching Plant?

>>Next: How to Clean the Cement Silo in A Concrete Batching Plant

Get Support & Quotation

Please fill in the form below(* are required), and we will get in touch with you as soon as possible.

Concrete Plant Concrete Mixer Crusher Other

Contact Us

Tel: 008637165861518

Fax: 008637165861528

E-mail:info@camelway.com

Mobile: 008618838109566

WhatsApp: 008618838109566

Skype: Camelway1983