Home > Service

Spare & Wear Parts Service

We can ensure that even after our original parts were used for many years, the machine can still operate without problems. Original parts contribute to preserving the value of machine. Many years of experience and regular analysis of raw materials ensure a long service life and unsurpassed capacity to prevent breakdowns. The installation of original parts can prolong the service life and maximize production output. As a result, maintenance cost is reduced to a minimum and you can get the maximum profit. We promise that we will offer you spare parts and wear parts with complete models, stable and reliable performance at any time to ensure smooth operation of your equipment.

Case

  • HZS25 Concrete Batching Plant in Colombo, Sri LankaHZS25 Concrete Batching Plant in Sri Lanka

    Colombo is the capital and chief port of this country and the financial center of the island and a popular tourist destination. So the tourism takes an important role in the country's development....

  • Camelway JS500 Concrete Mixers in Karachi, PakistanCamelway JS500 Concrete Mixers in Karachi, Pakistan

    Camelway JS series of concrete mixing machine uses the mixing tank made of extra-rigid material that reduces the risk of deformation during the transportation(or in container) and during the full load operation....

  • HZS90 Concrete Batching Plant in Astana, KazakhstanHZS90 Concrete Batching Plant in Kazakhstan

    CamelWay HZS90 concrete batching plant has high efficiency with belt feeder and a high productivity equipped with JS1500 concrete mixer. Its theoretical productivity is 90m³/h....

  • HZS35 Concrete Batching Plant in Constantine, AlgeriaHZS35 Concrete Batching Plant in Algeria

    Two sets of CamelWay HZS35 concrete batching plant were used in the local hospital construction project in Constantine, Algeria. Constantine is a famous city of Algeria. ...

  • Double HZS90 Concrete Batching Plant for Hydropower Infrastructure in Tibet,ChinaConcrete Batching Plant for Hydropower Infrastructure in Tibet

    The main work of this project is to build a new water supply of 2000 cubic meters per day, long-term water supply of 3000 cubic meters per day water supplying plant...