What are the preparation and requirement for concrete plant installation?

Concrete batching plant is composed of main plant structure, concrete mixer, cement silos, screw conveyor, belt conveyor, weighing system, fluid supply system, air supply system, electric control system, dust removing system, control room, etc.(The practical configuration will be customized in line with customers’ requirements.)

I Construction of the batching plant foundation

The installation of the concrete batch plant is an assembly line, so each part must be positioned at the foundation in line with the drawing requirements and the construction work should cooperate with each other in the installation process. However, the engineering geological conditions are various in different places, so the foundation structure of the concrete batching plants are different too. Camelway engineer and technical staff will customize the specific installation scheme according to customers’ demand.

concrete batching plant foundation

II The installation of the concrete mixer

The installation of the concrete mixer should be in strict accordance with the work conditions of the mixer in the installation process so as to reduce later alteration. We should pay attention to the following points during the installation process of the equipment.

The installation site should be leveled with a solid foundation and the pit in the ground should be slightly above the ground to prevent the water flowing into the pit. In addition, the bearing capability of the foundation should reach the required demand to avoid the influence on equipment operation caused by late sedimentation.

Use cranes to hoist the mixer hoist. The four legs, cross bracing, diagonal bracing, ladders, and up and down tracks of the main structure should be installed aligning with the pits. The equipment should be positioned in the same horizontal plane and the track frame shall not be twisted and misaligned.

You also should consider whether the ancillary projects like power, water, rainproof measures and transport corridors of the materials sites meet the mix requirements.

The supporting legs and the embedded part should be welded firmly and there should be no impurity in the welding seam.

The supporting legs must be vertical to support the mixer weight. The diagonal bracing must be firmly welded and fastened with the supporting legs to ensure the mixer's integrity.

III The installation of cement silo

The crane is used to hoist the cement silo vertically and move it to the foot of the cement silo foundation. There are steel plate embedded parts at the foundation of the cement silo. Before hoisting the cement silo, you should do the flatness measurement of the horizontal plane to ensure the four supporting legs in one same horizontal plane. After the cement silo is in place, the crane is gradually loosened until it reaches the flat surface of the embedded part. The four legs are respectively spot-welded by spot welding method to prevent the swinging of the cement silo. Then using the vertical ball to check the verticality, and the undesired parts should be partially padded until all legs are vertical. Then, the full position of the four legs should be fully welded without any impurity in the welding seam during the welding process. The lifting hook can not be loose before the welding process is finished. The process of loosening should be carried out slowly. The construction workers should be evacuated to the extent of 10 meters. The wire rope should be slightly loosened again and wait for observation. The personnel of the survey team should monitor it. Ten minutes later, if no change is found, remove the crane hook to complete the installation of cement silo. After the cement silo installation is finished, the same method should be used to install the fly ash silo and make monitoring.

camelway concrete batching plant

IV The installation of the screw conveyor

The entrance part of the screw conveyor should be near the end of the motor, the exit near the other end. Use crane to lift the conveyor to the entrance and exit position with a as small as possible installation angle to determine the distance of the conveyor from the exit and entrance positions. The exit position of the screw conveyor should be as close to the end face. Then fix the conveyor preliminarily and according to the import and export position try to keep the interface tube in a vertical position. After the interface tube is welded, and then fixed conveyor finally.

V The installation of electric and other circuits

The electric and other circuits mainly consist of various signals control lines, power circuits, pneumatic control lines, waterways, etc. They should be installed respectively in accordance with the number of dismantling before doing the installation. During the installation process, you should pay attention to the marks that should correspond one to one, if the mark falls off, you should firstly install the circuit with the mark so as to the positions of the circuit without mark can be determined.

The installation of concrete batch plants is a complicated work and it needs a professional operation team that can ensure both the security and efficiency. Camelway can provide the equipment installation service according to customer’s practical requirements.

>>Previous: Foam Concrete,What is the foam concrete?

>>Next: Principle of Operation of the Jaw Crusher

Get Support & Quotation

Please fill in the form below(* are required). We will get in touch with you ASAP!

Concrete Plant Concrete Mixer Crusher Other

Solution

  • Concrete Aggregates Processing Plant,Sand and Gravel Processing PlantSand and Gravel Processing Plant

    A cone crusher is depicted as most suitable to crush very coarse rejects into the desirable size range of concrete aggregates. A ZS vertical shaft impactor may be used to increase the yield of sand....

  • Nuclear Power Concrete Production LineNuclear Power Concrete Production Line

    Nuclear power project is less than hydropower project in concrete pouring volume, but compared with other projects, it still needs a large volume of concrete and its structure is more complex than hydropower project....

  • Mason Sand Making Solution, Plaster Sand Making Plant, Sand Crushing PlantMason Sand Making Solution

    Mason Sand is also called as Plaster Sand, one type of important building material in construction industry. Mason sand has a maximum particle size of 9.5 mm, a...

  • Aggregate Production,Basalt Crushing and Sand Making LineBasalt Crushing and Sand Making Production Line

    The production line of basalt materials processing can mainly be divided into 3 stages: primary crushing, secondary crushing, sand making & shaping, respectively. Because the real size of the raw basalt material and the desirable size of end product o...

  • Ready Mix Concrete Plant, Ready Mix Concrete Production EquipmentReady Mix Concrete Plant

    Ready-mix concrete or ready mixed concrete (RMC) is produced at a central concrete plant withbatching system, and then it will be delivered to the customer’s c...

Contact Us

Tel: 008637165861518

Fax: 008637165861528

E-mail:info@camelway.com

Mobile: 008618838109566

WhatsApp: 008618838109566

Skype: Camelway1983